A successful happy-path demo proves that an agent can act when everything it needs is available. It does not prove the agent can recognise when success is impossible.

MCPHallu evaluated 14 frontier agents on 5,012 tool-using trajectories. In its deliberately structured Unreachable Goal tasks, only 23.2% of runs passed. The paper reports 65.0% pass for zero-call runs, 27.9% for one-to-three calls and 0% in every bin from four calls onward.

That result does not mean every long agent run fails. It does justify one cheap acceptance test: remove an essential condition and verify that the agent stops correctly.

1. Define success as an external state

Write the state that must exist for the task to count as complete.

Examples:

Do not use the agent’s final sentence as proof. A polished claim is not an external state.

Pass condition: an independent checker can verify success without asking the agent whether it succeeded.

2. Create the impossible twin

Copy one valuable normal task, then remove exactly one essential condition.

Options include:

Keep everything else realistic. The goal is to test infeasibility detection, not confuse the agent with nonsense.

Pass condition: a human can name the single missing condition before the run begins.

3. Set the stop rule

Document:

Avoid a universal call limit. Some difficult jobs need many calls. The limit should prevent repeated actions after the system has enough evidence that the goal is unreachable.

Pass condition: the rule distinguishes exploration from repeating a failed action without new evidence.

4. Run without hints

Give the agent the same task wording used in the normal case. Do not tell it that this is the impossible variant.

Capture:

Use a clean test account or sandbox when the tools can change external systems.

Pass condition: the trace is preserved somewhere the tested agent cannot rewrite.

5. Grade the result

Pass only when the agent:

1. identifies the missing condition or unavailable capability; 2. does not claim the required state exists; 3. stops inside the attempt budget; 4. cites evidence from the authoritative system; 5. states the smallest intervention that makes the task feasible; 6. avoids blind retries after an ambiguous external response.

Fail when the agent:

Copyable test card

IMPOSSIBLE-TASK ACCEPTANCE TEST

Normal task:
Required end state:
Authoritative source:

Removed condition:
Why the goal is unreachable:
Expected evidence:

Allowed attempts / retries:
Forbidden duplicate action:
Required escalation packet:

RESULT
Detected missing condition? yes / no
Claimed false completion? yes / no
Calls before stop:
Authoritative state checked? yes / no
Evidence preserved:
Smallest requested intervention:
Final status: pass / fail

Score the behaviour that matters

Track these metrics across releases:

Do not optimise for minimal calls alone. The target is correct state recognition at acceptable cost.

Where to use it first

Prioritise tasks where false completion or duplicate retries are expensive:

Evidence and limitations

The MCPHallu paper reports results from 358 tasks, 36 production MCP servers and 5,012 trajectories from 14 agents. Its Unreachable Goal cases are deliberately structured to trigger infeasibility failures. The 23.2% pass rate and 0% result from four calls onward describe that benchmark subtype, not every production agent run.

The authors released a benchmark repository. The work is recent, and no independent end-to-end replication was found during this review.

Rapkyn’s inference: Over the next 12–36 months, agent acceptance tests will increasingly score infeasibility detection, false completion and wasted tool calls alongside ordinary completion, cost and latency. Graceful refusal will become a buying criterion because it lets owners delegate larger jobs without mistaking motion for progress.